Consent for the use of cookies

You are here

IPV
Integrated
Photovoltaic

A showcase of case studies, 
products and tools for IPV

Supported by:

IEA PVPS Task 15 project aims to create an enabling framework to accelerate the penetration of BIPV products in the global market of renewables.

Operazione co-finanziata dall’Unione europea, Fondo Europeo di Sviluppo Regionale, dallo Stato Italiano, dalla Confederazione elvetica e dai Cantoni nell’ambito del Programma di Cooperazione Interreg V-A Italia-Svizzera

Geschäftszentrum Colma Srl

new construction

Building use: 
commercial
IPV integration year: 
between 2016 and 2020

Geschäftszentrum Colma Srl

Contrada Pace 1, Tolentino (MC), Italien

Introduction

Stakeholders

Data

Producer and installer

Map

The case study is the new directional center by Colma Srl, company active in medical devices production and marketing. On the south front of the building a semi-transparent BIPV canopy shades the structures below.

STAKEHOLDERS

Main building designer: 

Studio Severini Associati + Partners

IPV system designer: 

GruppoSTG Srl

IPV components producer: 

GruppoSTG Srl

Address: 
Via P. Paleocapa 19, Bergamo (BG), Italien
Contact: 
+39 035-0510171
Web: 
https://www.gruppostg.com/it/
IPV system installer: 

GruppoSTG Srl

Address: 
Via P. Paleocapa 19, Bergamo (BG), Italien
Contact: 
+39 035-0510171
Web: 
https://www.gruppostg.com/it/
Other stakeholders: 

Manini Prefabbricati

PROJECT DATA

Project type: 
BIPV SYSTEM DATA
Architectural system: 
Vordach
Integration year: 
2019
Active material: 
monokristallines Silizium
Module transparency: 
System power [kWp]: 
18
IPV components producer: 

GruppoSTG Srl

Address: 
Via P. Paleocapa 19, Bergamo (BG), Italien
Contact: 
+39 035-0510171
IPV system installer: 

GruppoSTG Srl

Address: 
Via P. Paleocapa 19, Bergamo (BG), Italien
Contact: 
+39 035-0510171
Contrada Pace 1, Tolentino (MC), Italien